Built for GCC infrastructureDeterministic by design

From public benchmarks to defensible project decisions.

Estimate infrastructure CAPEX, test PPP suitability and run an indicative finance case—using traceable rules, cited data and your own assumptions.

8

asset classes

12

PPP structures

6

duration scenarios

Assessment snapshot

Illustrative user scenario

Model assumptions

Indicative CAPEX

SAR 2.08bn

P50 estimate

PPP suitability

78 / 100

Strong potential

Preferred term

25 years

Rule-selected

Cost bridge

Calculated
Base
Scope
Loc.
Risk
IDC
Total

Preferred structure

DBFOM

  • Measurable performance
  • Lifecycle integration
  • Credible payment security
Traceability: every value is tagged as a published fact, user assumption or calculated result.

Supported asset classes

A modular benchmark framework for essential GCC infrastructure.

Each asset class carries its own compatible units, technical inputs, scope logic and scaling exponent. The engine never substitutes an unrelated project type.

Power substations

SAR / MVA

Desalination plants

SAR / m³/day

Solar PV plants

SAR / MWdc

Gas-fired power

SAR / MW

Wastewater treatment

SAR / m³/day

Airports

SAR / passenger

Parking projects

SAR / space

Schools PPP

SAR / student place

Assessment workflow

One auditable chain from input to output.

01

Define the asset

Enter project basics and the technical variables that actually drive cost.

02

Normalize comparables

Filter compatible records, normalize price year and currency, then apply transparent scope factors.

03

Test PPP fit

Score procurement structures using fixed, configurable transfer and bankability rules.

04

Run the model

Calculate cash flows, coverage ratios, returns, sensitivities and contract-duration trade-offs.

Designed for scrutiny

A model your investment committee can interrogate.

InfraBench separates evidence from judgement. Source confidence, excluded comparables, adjustment factors and every cash-flow line remain visible throughout the assessment.

Read the calculation methodology

Evidence labels

Published fact, user assumption and calculated result are visually distinct.

Transparent formulas

Cost normalization, financial returns and coverage ratios expose their calculation trail.

Validation gates

Unit mismatches, incomplete debt repayment and insufficient comparables stop misleading output.

Institutional output

Print-ready results, scenario exports and decision reasons support formal review.

Start with a defined scenario

Build an indicative infrastructure case in one structured workflow.

Begin assessment

Preliminary-use disclaimer. This assessment is an indicative pre-feasibility benchmark based on public data and user-defined assumptions. It is not a feasibility study, valuation, tender estimate, legal opinion, investment recommendation or financing commitment.